S.no Name Of The Project Project Cost Date Of Upload In The Website Findings & Recommendations
1 “1. Providing Drinking Water Supply Project in Coastal Area of East Godavari District 2. Providing Drinking Water Supply Project in Coastal Area of West Godavari District 3. Providing Drinking Water Supply Project in Coastal Area of Krishna District 4. Providing Drinking Water Supply Project in Palnadu Area of Guntur District & 5. Providing Drinking Water Supply Project in Western Part of Prakasam District.” Above 100 Crores 27-Apr-2022 Click Here
2 AVR HNSS PROJECT – PHASE-II – Widening of Punganur Branch Canal from Km.79.600 to Km 220.350 for enhancing the carrying capacity including construction of CM & CD works to meet the drinking water needs of Thamballapalle, Madanapalle, Punganur and Palamaner constituencies and Development of Irrigation Network in Punganur Constituency in Chittoor District 5036 Cr 10-Aug-2022 Click Here
3 B.R.R. Vamsadhara Project Phase-II of Stage-II – Hiramandalam Lift Scheme – Detailed Investigation, Designs and Construction of Lift Irrigation Scheme for Drawl and Lifting of water from Gotta Barrage Right Main Canal @ KM 2.400 near Korada (Village), Hiramandalam (Mandal) of Srikakulam District, and dropping into Hiramandalam Reservoir with Components Such as construction of Pump House, associated Civil, Hydro – Mechanical, Electro – Mechanical Works, Construction of Electrical Sub Station, Transmission Lines including installation, Laying of MS Pressure Mains, Construction of Delivery Cistern, Operation and Maintenance of entire system complete for providing Irrigation facilities, Drinking water facilities to UDDANAM Project and to achieve early benefits” 176 Cr 04-Nov-2022 Click Here
4 Balance works of Excavation Of Flood Flow Canal Taking Off From Mahendratanaya River including CM & CD works Near Chapara(V) Of Meliaputti Mandal In Srikakulam District , Formation Of Offshore Reservoir Near Regulapadu (V) ,Excavation Of Right Main Canal, Left Main Canal Taking Off From Reservoir Including its CM & CD works to provide irrigation facility to command an ayacut of 9960 Ha(24,600 Acres). 852. 45Cr 24-Nov-2022 Click Here
5 Balance works of Package-21 –Barrage and its allied works including civil & mechanical works, Diversion Canal including CM&CD works, Formation of Main Earth Dam from km 0.000 to km 2.200, Dyke-II, Dyke-III and Construction of Left Head Sluice (Erstwhile Package-21) and Construction of Additional Sluice at km 2.000 on main earth dam of Taraka Rama Thirtha Sagaram Reservoir Project in Vizianagaram District”(UNDER LUMPSUM CONTRACT SYSTEM) 194.4 Cr 09-Nov-2022 Click Here
6 Construction of Flood Protection Wall along the left margin of Krishna River from Kanakadurgamma Varadhi to Kotinagar in Vijayawada City Above 100 Crores 20-Apr-2020 Click Here
7 Construction of Flood Protection Wall along the left margin of Krishna River from Padmavathi Ghat to Kanakadurgamma Varadhi in Vijayawada City (Phase-III). 138.8 Cr 18-Oct-2022 Click Here
8 DESIGN, SUPPLY, CONSTRUCTION, TEST & COMMISSIONING OF EXTERNAL WATER SUPPLY SCHEME TO MEGA INDUSTRIAL HUB (MIH) ORVAKAL (PHASE-1, PACKAGE-1) IN KURNOOL DISTRICT, ANDHRA PRADESH (UNDER EPC) Above 100 Crores 09-Feb-2022 Click Here
9 Design, Supply, Construction, Test and Commissioning of 800 mm dia DI-K9 Pipe line from Mydukur to MIP Kopparthy duly tapping at Mydukur on existing RTPP water supply line in YSR Kadapa District including O&M for 3 years (DLP 2years + 1year O&M from date of Commissioning) (under EPC mode) Above 100 Crores 8-Jun-2022

Click Here
Latest Amendments

10 Drilling of bore wells to farmers under YSR Rythu Bhorosa in Andhra pradesh Above 100 Crores 20-Nov-2019 Click Here
11 Excavation of Flood flow channel from foreshore of Kalavakunta Barrage (NTR Jalasayam) to feed chain of tanks in Penumur and Gangadhara Nellore mandals of Chittoor District” under LS Contract System. 193.23 Cr 20-Oct-2022 Click Here
12 FEEDING OF WATER TO 195 MINOR IRRIGATION TANKS BY GRAVITY AND LIFT FROM HNSS MAIN CANAL IN PUTTAPARTHI ASSEMBLY CONSTITUENCY, ANANTHAPURAMU DISTRICT WITH MAINTENANCE OF ENTIRE SYSTEM FOR 15 YEARS INCLUDING DEFECT LIABILITY PERIOD OF 2 YEARS UNDER EPC TURNKEY SYSTEM. Above 100 Crores 21-Feb-2022 Click Here
13 GNSS Package-II of Phase-I, Earthwork excavation of GNSS Main Canal including construction of CM & CD works and Formation of earthen bund for Vamikonda Sagar Reservoir & Narreddy Siva Rami Reddy (Sarvaraya Sagar) Reservoir and leading channels to Reservoirs and its Distributory System (Balance Work) Above 100 Cr 05-Jan-2023 Click Here
14 Permanent restoration of Annamayya Project near Badanagadda (V), Rajampet Mandal of Annamayya District. 787.77 Cr 22-Dec-2022 Click Here
15 PROVIDING DRINKING WATER SUPPLY PROJECT IN THE WESTERN PART OF CHITTOOR DISTRICT” IN ANDHRA PRADESH 2370 CR 18-Jul-2022 Click Here
16 Providing Drinking Water Supply Scheme to Uddanam Area of Srikakulam District of Andhra Pradesh Above 100 CR 04-May-2020 Click Here
17 Public Health Circle, Ananthapuramu – Proddatur Municipality – Remodeling of existing water supply distribution pipeline and construction of ELSRs (4 Nos) with full SCADA including restoration of roads in Proddatur Municipality. Above 100 Crores 05-Jul-2022 Click Here
18 SUPPLY & INSTALLATION OF SUBMERSIBLE PUMP SETS WITH ACCESSORIES SUITABLE FOR AGRICULTURAL BOREWELLS Above 100 CR 19-Nov-2020 Click Here
19 SUPPLY AND INSTALLATION OF MICRO IRRIGATION SYSTEMS, 2021-22 Above 100 CR 11-Aug-2021 Click Here
20 Water Resources Department – HNSS Project Phase II – “Line estimate including S&L Operations for the proposed By-Pass canal from Km 41.000 to Km 125.000 of Madakasira Branch Canal to feed tanks in Madakasira constituency in Anantapuramu District (now Satyasai District) and maintenance for a period of 15 years. 214.85 Cr 31-Oct-2022 Click Here