Water Supply Treatment

S.no Name Of The Project Project Cost Date Of Upload In The Website Findings & Recommendations
1 “1. Providing Drinking Water Supply Project in Coastal Area of East Godavari District 2. Providing Drinking Water Supply Project in Coastal Area of West Godavari District 3. Providing Drinking Water Supply Project in Coastal Area of Krishna District 4. Providing Drinking Water Supply Project in Palnadu Area of Guntur District & 5. Providing Drinking Water Supply Project in Western Part of Prakasam District.” Above 100 Crores 27-Apr-2022 Click Here
2 AVR HNSS PROJECT – PHASE-II – Widening of Punganur Branch Canal from Km.79.600 to Km 220.350 for enhancing the carrying capacity including construction of CM & CD works to meet the drinking water needs of Thamballapalle, Madanapalle, Punganur and Palamaner constituencies and Development of Irrigation Network in Punganur Constituency in Chittoor District 5036 Cr 10-Aug-2022 Click Here
3 Construction of Flood Protection Wall along the left margin of Krishna River from Kanakadurgamma Varadhi to Kotinagar in Vijayawada City Above 100 Crores 20-Apr-2020 Click Here
4 DESIGN, SUPPLY, CONSTRUCTION, TEST & COMMISSIONING OF EXTERNAL WATER SUPPLY SCHEME TO MEGA INDUSTRIAL HUB (MIH) ORVAKAL (PHASE-1, PACKAGE-1) IN KURNOOL DISTRICT, ANDHRA PRADESH (UNDER EPC) Above 100 Crores 09-Feb-2022 Click Here
5 Design, Supply, Construction, Test and Commissioning of 800 mm dia DI-K9 Pipe line from Mydukur to MIP Kopparthy duly tapping at Mydukur on existing RTPP water supply line in YSR Kadapa District including O&M for 3 years (DLP 2years + 1year O&M from date of Commissioning) (under EPC mode) Above 100 Crores 8-Jun-2022 Click Here
6 Drilling of bore wells to farmers under YSR Rythu Bhorosa in Andhra pradesh Above 100 Crores 20-Nov-2019 Click Here
7 FEEDING OF WATER TO 195 MINOR IRRIGATION TANKS BY GRAVITY AND LIFT FROM HNSS MAIN CANAL IN PUTTAPARTHI ASSEMBLY CONSTITUENCY, ANANTHAPURAMU DISTRICT WITH MAINTENANCE OF ENTIRE SYSTEM FOR 15 YEARS INCLUDING DEFECT LIABILITY PERIOD OF 2 YEARS UNDER EPC TURNKEY SYSTEM. Above 100 Crores 21-Feb-2022 Click Here
8 PROVIDING DRINKING WATER SUPPLY PROJECT IN THE WESTERN PART OF CHITTOOR DISTRICT” IN ANDHRA PRADESH 2370 CR 18-Jul-2022 Click Here
9 Providing Drinking Water Supply Scheme to Uddanam Area of Srikakulam District of Andhra Pradesh Above 100 CR 04-May-2020 Click Here
10 Public Health Circle, Ananthapuramu – Proddatur Municipality – Remodeling of existing water supply distribution pipeline and construction of ELSRs (4 Nos) with full SCADA including restoration of roads in Proddatur Municipality. Above 100 Crores 05-Jul-2022 Click Here
11 SUPPLY & INSTALLATION OF SUBMERSIBLE PUMP SETS WITH ACCESSORIES SUITABLE FOR AGRICULTURAL BOREWELLS Above 100 CR 19-Nov-2020 Click Here
12 SUPPLY AND INSTALLATION OF MICRO IRRIGATION SYSTEMS, 2021-22 Above 100 CR 11-Aug-2021 Click Here
Top Skip to content