1 |
“1. Providing Drinking Water Supply Project in Coastal Area of East Godavari District 2. Providing Drinking Water Supply Project in Coastal Area of West Godavari District 3. Providing Drinking Water Supply Project in Coastal Area of Krishna District 4. Providing Drinking Water Supply Project in Palnadu Area of Guntur District & 5. Providing Drinking Water Supply Project in Western Part of Prakasam District.” |
RWS&S |
Water Management |
Above 100 Crores |
27-Apr-2022 |
Click Here
|
2 |
“Construction of Six Blocks of Andhra Pradesh Fisheries University, Narasapur, West Godavari District Viz., (i) Administrative Block, (ii) Academic Block, (iii) Boys Hostel, (iv) Girls Hostel, (v) Farmers Training Institute along with Dormitory, (vi) VC Bunglow and Other Basic Infrastructure. |
APEWIDC |
Education |
Above 100 Crores |
25-May-2022 |
Click Here
|
3 |
“Improvements and providing lining to GNSS Main Canal from Km.0.000 to Km.32.640/34.092 in YSR District” under LS Contract System. |
Water Resource Department |
Water Management |
Above 100 Crores |
11-Oct-2021 |
Click Here
|
4 |
“Improvements and providing lining to GNSS Main Canal from Km.32.640/34.092 to Km.56.00 in YSR District” under LS Contract System. |
Water Resource Department |
Water Management |
Above 100 Crores |
11-Oct-2021 |
Click Here
|
5 |
(1) Upgradation of Canal System from Pothireddypadu Head Regulator and BCR Complex from foreshore of Srisailam Reservoir & (2) Improvements to the existing SRBC/GNSS Canal up to Berm level from Banakacherla Complex to Gorakallu Balancing Reservoir from KM 0/0 to KM 56.775.. |
Water resourse Department |
Canals and Dams |
Above 100 CR |
25-Jul-2020 |
Click Here
|
6 |
1)Establishment of Super Specialty Block, 2) Establishment of Dr. YSR Cancer Care Centre, & 3) Establishment of Institute of Mental Health at YSR Kadapa District in the existing Government Medical College Campus in a Single Package |
APMSIDC |
Health |
Above 100 CR |
27-Oct-2020 |
Click Here
|
7 |
APCPDCL, Vijayawada covering the area within the districts – Guntur, Krishna and Prakasam of Andhra Pradesh:-(1.)Installation of Smart Meters/Whole current Energy Meters with local communication (IrDA/Bluetooth) with Modem & relays for agricultural purposes & (2.) Auxiliary Materials. |
APCPDCL |
Power |
|
21-Mar-2021 |
Click Here
|
8 |
APEPDCL, Visakhapatnam covering the area within the districts – East Godavari, West Godavari, Visakhapatnam and Vijayanagaram of Andhra Pradesh:-(1.) Installation of Smart Meters/Whole current Energy Meters with local communication (IrDA/Bluetooth) with Modem & relays for agricultural purposes & (2.) Auxiliary Materials. |
APEPDCL |
Power |
Above 100 Crores |
25-Mar-2021 |
Click Here
|
9 |
Appointment of Advanced Metering Infrastructure (AMI) Service Provider (AMISP) for Smart Prepaid Metering and system metering by replacing the existing meters to all Government, Commercial & Industrial Consumers, (excluding Agriculture) and to all the 11 KV Feeders & Distribution transformers with 25 KVA and above rating, in the Erstwhile Revenue Districts of Srikakulam, Vizianagaram, Visakhapatnam, Rajamahendravaram and Eluru within the Jurisdiction of the APEPDCL in TOTEX mode on DBFOOT basis |
APEPDCL |
Electrical |
628 Cr |
01-Dec-2022 |
Click Here
|
10 |
Appointment of Advanced Metering Infrastructure (AMI) Service Provider (AMISP) for Smart Prepaid Metering and system metering by replacing the existing meters to all Government, Commercial, Industrial & Domestic-(>200 U) Consumers, (excluding Agriculture) and to all the 33 & 11 KV Feeders & Distribution transformers with 25 KVA and above rating,, in the Erstwhile Revenue Districts of Nellore, Chittoor, Kadapa, Anantapuram & Kurnool within the Jurisdiction of the APSPDCL in TOTEX mode on DBFOOT basis |
APSPDCL |
Electrical |
789 Cr |
01-Dec-2022 |
Click Here
|
11 |
Appointment of Advanced Metering Infrastructure (AMI) Service Provider (AMISP) for Smart Prepaid Metering and system metering by replacing the existing meters to all Government, Domestic-(confining to AMRUT Cities), Commercial & Industrial Consumers, (excluding Agriculture) and to all the 33 & 11 KV Feeders & Distribution transformers with 25 KVA and above rating, in the Erstwhile Revenue Districts of Krishna, Guntur & Prakasam within the Jurisdiction of the APCPDCL in TOTEX mode on DBFOOT basis |
APCPDCL |
Electrical |
793 Cr |
01-Dec-2022 |
Click Here
|
12 |
APSPDCL, Tirupathi covering the area within the districts – Nellore, Chittoor, YSR Kadapa, Ananthapuramu and Kurnool of Andhra Pradesh:-(1.)Installation of Smart Meters/Whole current Energy Meters with local communication (IrDA/Bluetooth) with Modem & relays for agricultural purposes & 2. Auxiliary Materials |
APSPDCL |
Power |
Above 100 Crores |
25-Mar-2021 |
Click Here
|
13 |
AVR HNSS PROJECT – PHASE-II – Widening of Punganur Branch Canal from Km.79.600 to Km 220.350 for enhancing the carrying capacity including construction of CM & CD works to meet the drinking water needs of Thamballapalle, Madanapalle, Punganur and Palamaner constituencies and Development of Irrigation Network in Punganur Constituency in Chittoor District |
Water Resourses |
Water Supply |
5036 Cr |
10-Aug-2022 |
Click Here
|
14 |
B.R.R. Vamsadhara Project Phase-II of Stage-II – Hiramandalam Lift Scheme – Detailed Investigation, Designs and Construction of Lift Irrigation Scheme for Drawl and Lifting of water from Gotta Barrage Right Main Canal @ KM 2.400 near Korada (Village), Hiramandalam (Mandal) of Srikakulam District, and dropping into Hiramandalam Reservoir with Components Such as construction of Pump House, associated Civil, Hydro – Mechanical, Electro – Mechanical Works, Construction of Electrical Sub Station, Transmission Lines including installation, Laying of MS Pressure Mains, Construction of Delivery Cistern, Operation and Maintenance of entire system complete for providing Irrigation facilities, Drinking water facilities to UDDANAM Project and to achieve early benefits” |
Water Resources |
Irrigation |
176 Cr |
04-Nov-2022 |
Click Here
|
15 |
Balance works of Excavation Of Flood Flow Canal Taking Off From Mahendratanaya River including CM & CD works Near Chapara(V) Of Meliaputti Mandal In Srikakulam District , Formation Of Offshore Reservoir Near Regulapadu (V) ,Excavation Of Right Main Canal, Left Main Canal Taking Off From Reservoir Including its CM & CD works to provide irrigation facility to command an ayacut of 9960 Ha(24,600 Acres). |
Water Resources |
Irrigation |
852. 45Cr |
24-Nov-2022 |
Click Here
|
16 |
Balance works of Package-21 –Barrage and its allied works including civil & mechanical works, Diversion Canal including CM&CD works, Formation of Main Earth Dam from km 0.000 to km 2.200, Dyke-II, Dyke-III and Construction of Left Head Sluice (Erstwhile Package-21) and Construction of Additional Sluice at km 2.000 on main earth dam of Taraka Rama Thirtha Sagaram Reservoir Project in Vizianagaram District”(UNDER LUMPSUM CONTRACT SYSTEM) |
Water Resources |
Irrigation |
194.4 Cr |
09-Nov-2022 |
Click Here
|
17 |
COMMON FINDINGS & RECOMMENDATIONS OF THE JUDGE, JUDICIAL PREVIEW, A.P. Dt.04-02-2021-ON THE REQUEST FOR PROPOSAL (RFP) KEPT FOR PUBLIC VIEW TO SUBMIT ANY QUERIES, AS A PART OF THE JUDICIAL PREVIEW PROCESS BEFORE ITS FINALIZATION TO ISSUE TENDER NOTICES FROM THE TENDER DOCUMENTS INVITING ELIGIBLE BIDDERS TO SUBMIT BID ONLINE THROUGH THE GoAP’s ONLINE PROCUREMENT PORTAL (https://tender.apeprocurement.gov.in) BY THE REVERSE AUCTION PROCESS IN COMPLIANCE WITH THE E-PROCURMENT NOTICES INVITING TENDER CUM E-AUCTION (REVESE TENDERING), Viz, |
Water Resourses |
Canals and Dams |
Above 100 CR |
04-Feb-2021 |
Click Here
|
18 |
Comprehensive Under Ground Drainage Scheme in Pulivendula Municipality, YSR Kadapa District |
Public health and Muncipal Engineering |
Sewerage and Drainage |
Above 100 CR |
30-Jun-2020 |
Click Here
|
19 |
Construction / Strengthening / Upgradation of AHs / CHCs at the 12 places mentioned below in Chittoor District (under Package No.X) |
APMSIDC |
Health |
Above 100 CR |
11-Mar-2020 |
Click Here
|
20 |
Construction / Strengthening / Upgradation of AHs / CHCs at the 12 places mentioned below in YSR Kadapa District (under Package No.XI) |
APMSIDC |
Health |
Above 100 CR |
20-Mar-2020 |
Click Here
|
21 |
Construction of a new Reservoir across Kundu River to a capacity of 0.80 TMC near Joladarasi (V) of Koilkuntla (M) of Kurnool (Dt) |
Water resourse |
Canals and Dams |
Above 100 CR |
17-Jun-2020 |
Click Here
|
22 |
Construction of Five Fishing Harbours under Phase-II at Budagatlapalem in Srikakulam District – Pudimadaka in Visakhapatnam District – Biyyaputhippa in West Godavari District – Kothapatnam and Vodarevu in Prakasam District Under Lumpsum Contract |
AP Maritime Board |
Ports |
Above 100 Crores |
01-Feb-2022 |
Click Here
|
23 |
Construction of Flood Protection Wall along the left margin of Krishna River from Kanakadurgamma Varadhi to Kotinagar in Vijayawada City |
Water Resource Department |
Water Management |
Above 100 Crores |
20-Apr-2020 |
Click Here
|
24 |
Construction of Flood Protection Wall along the left margin of Krishna River from Padmavathi Ghat to Kanakadurgamma Varadhi in Vijayawada City (Phase-III). |
Water Resources |
Irrigation |
138.8 Cr |
18-Oct-2022 |
Click Here
|
25 |
Construction of Greenfield Port at Machilipatnam on Engineering Procurement and Construction Contract Basis. |
AP Maritime Board |
Public Markets |
Above 100 Crores |
07-Mar-2022 |
Click Here
|
26 |
Construction of Greenfield Port at Bhavanpadu on Engineering, Procurement and Construction Contract Basis” are the following with factual background and justification in nutshell |
Andhra Pradesh Maritime Board |
Ports and Inland Ports |
Above 100 CR |
07-Oct-2021 |
Click Here
|
27 |
Construction Of Greenfield Port At Machilipatnam, On Engineering Procurement And Construction Contract Basis |
Andhra Pradesh Maritime Board |
Ports and Inland Ports |
Above 100 CR |
05-Jul-2021 |
Click Here
|
28 |
Construction of Lift Irrigation Schemes and Supply Channels to feed MI Tanks in Lakkireddypally and Ramapuram Mandals in Y.S.R.Kadapa District from GNSS Canal to HNSS Canal through Kaletivagu Reservoir” under LS Contract System. |
Water Resources |
Water Supply |
Above 100 Crores |
24-Feb-2022 |
Click Here
|
29 |
Construction Of Multi Purpose Facilitation Centers Mpfcs Along With Drying Platforms:- In Vijayawada Krishna Division-Comprising of East Godavari, West Godavari and Krishna Districts |
Andhra Pradesh Agriculture Marketing Department |
Public Buildings |
Above 100 CR |
21-May-2021 |
Click Here
|
30 |
Construction Of Multi Purpose Facilitation Centers Mpfcs Along With Drying Platforms:- In Kadapa Division-Comprising of Chittoor, YSR Kadapa, Kurnool and Ananthapuramu Districts |
Andhra Pradesh Agriculture Marketing Department |
Public Buildings |
Above 100 CR |
21-May-2021 |
Click Here
|
31 |
Construction of new Paediatric Super Specialty Hospital in the premises of SVIMS Tirupati |
TTD |
Health |
Above 100 Crores |
29-Mar-2022 |
Click Here
|
32 |
Construction of Tribal Engineering College at Kurupam (V) & (M) in Vizianagaram District |
APEWIDC |
Education Institutions |
Above 100 CR |
16-Dec-2020 |
Click Here
|
33 |
CONSTRUCTION OF TUDA TOWERS AT NORTH-WEST CORNER OF ANNAMAIAH CIRCLE ABUTTING RC ROAD AND AIR BY-PASS ROAD IN TIRUPATI, TIRUPATI DISTRICT, ANDHRA PRADESH(Findings & Recommendations) |
MA&UDA Department |
Urban Development |
275 Cr |
19-Oct-2022 |
Click Here
|
34 |
Construction/Strengthening/Upgradation of AHs/CHCs at the 17 places mentioned below in Ananthapuramu District (under Package No.XII) |
APMSIDC |
Health |
Above 100 CR |
11-Mar-2020 |
Click Here
|
35 |
Construction/Strengthening/Upgradation of AHs/CHCs at the 21 places mentioned below in East Godavari District (under Package No.IV) |
APMSIDC |
Health |
Above 100 CR |
20-Mar-2020 |
Click Here
|
36 |
De-siltation of Silt from the Foreshore of Sir Arthur Cotton Barrage from K.M.3.000 to K.M.12.150 in Godavari river towards Right Bank (AGRB) in West Godavari District. |
Water Resource Department |
Water Management |
Above 100 Crores |
12-Jan-2022 |
Click Here
|
37 |
De-silting of Silt from the Foreshore of Sir Arthur Cotton Barrage from K.M.3.000 to K.M.12.150 in Godavari river towards Left Bank (AGLB) in East Godavari District. |
Water Resource Department |
Water Management |
Above 100 Crores |
12-Jan-2022 |
Click Here
|
38 |
Design, Construction, Testing, Commissioning and Operation and also the Maintenance of Infrastructure Works at Krishnapatnam Node under Chennai Bengaluru Industrial Corridor (CBIC) On EPC Basis- |
APIIC |
Road Transport |
Above 100 Crores |
03-Aug-2021 |
Click Here
|
39 |
Design, engineering, manufacturing, testing before dispatch, loading, supply for destination including transportation, civil & construction works, erection, testing and commissioning of i) Augmentation of ICTs capacity from 3 x 315 MVA to (3 x 315 MVA + 1 x 500MVA) and 4 Nos.220kV Bay extensions at 400kV SS Talaricheruvu for Urichintala Solar park in Anantapuramu Dist. of Andhra Pradesh, ii). Nos.220kV Bay extensions at 400kV SS Jammalamadugu for M.Kambaladinne Solar park in Kadapa Dist. of Andhra Pradesh, iii). Construction of 220kV Switching station at Mudigubba in Anantapuramu Dist. of Andhra Pradesh with 400kV |
AP Transco |
Solar and Wind Engrgy |
Above 100 CR |
28-Aug-2020 |
Click Here
|
40 |
DESIGN, SUPPLY, CONSTRUCTION, TEST & COMMISSIONING OF EXTERNAL WATER SUPPLY SCHEME TO MEGA INDUSTRIAL HUB (MIH) ORVAKAL (PHASE-1, PACKAGE-1) IN KURNOOL DISTRICT, ANDHRA PRADESH (UNDER EPC) |
Water Resource Department |
Water Supply |
Above 100 Crores |
09-Feb-2022 |
Click Here
|
41 |
Design, Supply, Construction, Test and Commissioning of 800 mm dia DI-K9 Pipe line from Mydukur to MIP Kopparthy duly tapping at Mydukur on existing RTPP water supply line in YSR Kadapa District including O&M for 3 years (DLP 2years + 1year O&M from date of Commissioning) (under EPC mode) |
APIIC |
Infrastructure |
Above 100 Crores |
8-Jun-2022 |
Click Here
Latest Amendments
|
42 |
Design, Supply, Installation and Commissioning of Distribution Infrastructure Works Under Loss Reduction by Segregation of Agl Feeders and Bifurcation of Over Loaded 33kv Feeders in Nellore, Chittoor, Kadapa & Kurnool and Anantapuramu Districts (Old) of APSPDCL with 4 Nos Packages under “The Reforms Based and Results Linked – Revamped Distribution Sector Scheme” (RDSS) On Partial Turnkey |
APSPDCL |
Electrical |
Above 100 Cr |
06-Dec-2022 |
Click Here
|
43 |
DEVELOPMENT OF DISTRIBUTION INFRASTRUCTURE BY SEGREGATION OF AGRICULTURE FEEDERS, BIFURCATION OF OVERLOADED FEEDERS AND REPLACEMENT OF OLD/FRAYED CONDUCTOR IN KRISHNA AND GUNTUR DISTRICTS IN THE JUSRISDICTION OF ANDHRA PRADESH CENTRAL POWER DISTRIBUTION CORPORATION LIMITED of ANDHRA PRADESH UNDER REVAMPED REFORMS-BASED AND RESULTS-LINKED, DISTRIBUTION SECTOR SCHEME ON PARTIAL TURNKEY BASIS |
APCPDCL |
Electrical |
Above 100 Cr |
06-Dec-2022 |
Click Here
|
44 |
Drilling of bore wells to farmers under YSR Rythu Bhorosa in Andhra pradesh |
PR & RD |
Water Management |
Above 100 Crores |
20-Nov-2019 |
Click Here
|
45 |
Energy Dept. – APEPDCL – Projects – RDSS – Development of Distribution Infrastructure by Segregation of Agriculture Feeders and Bifurcation of Overloaded Feeders in APEPDCL in two packages under partial turnkey basis |
APEPDCL |
Electrical |
Above 100 Cr |
06-Dec-2022 |
Click Here
|
46 |
Energy Dept. – APEPDCL – Projects – VSP – Reform based and Results linked, Revamped Distribution Sector Scheme” introduced by Govt. of India – Tender for UG Cabling and Covered Conductor works in Disaster Prone areas in single package under full turnkey basis |
APEPDCL |
Electrical |
Above 100 Cr |
06-Dec-2022 |
Click Here
|
47 |
Engineering, Procurement & Construction Of Flue Gas Desulphurisation (for short ‘FGD’) Plant 2×800 Mw Stage-I and 1×800 Mw Stage-II SDSTPS Krishnapatnam, Nellore District, Andhra Pradesh |
AP Genco |
Waste Management |
Above 100 CR |
26-Nov-2020 |
Click Here
|
48 |
Engineering, Procurement and Construction Of Flue Gas Desulphurisation plant at Dr Narla Tata Rao Thermal Power Station Stage V – 1×800 MW Unit No 8 under construction at Ibrahimpatnam, Krishna District, Andhra Pradesh, India |
AP Genco |
Gas and Gas Works |
Above 100 CR |
26-Nov-2020 |
Click Here
|
49 |
Establishment of (05) five Multi Specialty Hospitals in ITDA areas under Tribal Sub Plan |
APMSIDC |
Health |
Above 100 CR |
20-Nov-2020 |
Click Here
|
50 |
Establishment of Government Medical College at Machilipatnam of Krishna District |
APMSIDC |
Health |
Above 100 CR |
16-Dec-2020 |
Click Here
|
51 |
Excavation of Flood flow channel from foreshore of Kalavakunta Barrage (NTR Jalasayam) to feed chain of tanks in Penumur and Gangadhara Nellore mandals of Chittoor District” under LS Contract System. |
Water Resources |
Irrigation |
193.23 Cr |
20-Oct-2022 |
Click Here
|
52 |
Exploration, Development & Operation/s of 25 Ha. Iron Ore bearing area in H. Siddapuram Village, D. Hirelal Mandal, Ananthapuram District, A.P on Raising Cum Sale Contract Basis |
APMDCL |
Public Markets |
Above 100 CR |
24-Jun-2021 |
Click Here
|
53 |
FEEDING OF WATER TO 195 MINOR IRRIGATION TANKS BY GRAVITY AND LIFT FROM HNSS MAIN CANAL IN PUTTAPARTHI ASSEMBLY CONSTITUENCY, ANANTHAPURAMU DISTRICT WITH MAINTENANCE OF ENTIRE SYSTEM FOR 15 YEARS INCLUDING DEFECT LIABILITY PERIOD OF 2 YEARS UNDER EPC TURNKEY SYSTEM. |
Water Resource Department |
Water Management |
Above 100 Crores |
21-Feb-2022 |
Click Here
|
54 |
Formation of Balancing Reservoirs 3 No.s 1. Mudivedu Balancing Reservoir near Mudivedu(V) in Kurabalakota(M) 2.Nethiguntapalli Balancing Reservoir near Nethiguntapalle (V) in Punganur (M) and 3. Avulapalli Balancing Reservoir near Avulapalli (V) in Somala (M) of Chittoor Dist.a |
Water Resourses |
Canals and Dams |
Above 100 CR |
24-Feb-2021 |
Click Here
|
55 |
GNSS Package-II of Phase-I, Earthwork excavation of GNSS Main Canal including construction of CM & CD works and Formation of earthen bund for Vamikonda Sagar Reservoir & Narreddy Siva Rami Reddy (Sarvaraya Sagar) Reservoir and leading channels to Reservoirs and its Distributory System (Balance Work) |
Water Resources |
Irrigation |
Above 100 Cr |
05-Jan-2023 |
Click Here
|
56 |
HIRING OF DRONE /AERIAL PHOTOGRAPHY AS A END – TO – END SOLUTION FOR LARGE SCALE MAPPING (AGRICULTURAL LAND) AND SVAMITVA UNDER RESURVEY PROJECT. |
Survey and Land Records |
Land Reclamation |
Above 100 Crores |
30-Sep-2021 |
Click Here
|
57 |
HNSS Project Phase-II – Investigation, design and Formation of Jilledubanda Reservoir, near Mudigubba, including construction of 2No’s off take sluices, surplus weir and off take-cum-Cross Regulator on HNSS Main Canal @Km 377.100 and Distributory system including construction of CM&CD works in Mudigubba, Bathalapalli, Tadimarri & Dharmavaram Mandals in Ananthapuramu District |
Water Resource Department |
Water Management |
Above 100 Crores |
13-Sep-2021 |
Click Here
|
58 |
In The Case Of Design, Engineering, Manufacturing, testing at manufacturer’s works before dispatch, Supply, transportation, storage at site, insurance, erection, testing and commissioning of 2 Nos.,115 MW capacity Vertical Francis Turbine generator units along with all associated auxiliary and ancillary equipment, 220KV switchyard & Power evacuation Structures including balance civil works of power house, Penstock, Butterfly valve, Spherical /Shutoff Rotary valves etc., at Lower Sileru Power House on EPC (TURN KEY) basis. |
APGENCO |
Electricity |
Above 100 Crores |
07-Jun-2021 |
Click Here
|
59 |
In the matter of Construction/Strengthening/Upgradation of AHs/CHCs at the 16 places mentioned below in Kurnool District (under Package No.XIII) |
APMSIDC |
Health |
Above 100 CR |
22-May-2020 |
Click Here
|
60 |
Installation of 125 Ft Statue of Dr.Babasaheb Bhimrao Ramji Ambedkar and Development of Park at Dr.B.R.Ambedkar Swaraj Maidan, Vijayawada. |
APIIC |
Sports and Public Gardens |
Above 100 CR |
12-Apr-2021 |
Click Here
|
61 |
Investigation and Construction of Lift Schemes to Lift water from GNSS to HNSS under EPC Turnkey System |
Water resourses |
Canals and Dams |
Above 100 CR |
07-Dec-2020 |
Click Here
|
62 |
Investigation, Design, Construction of Lift Scheme- for Lifting of water from Polavaram Reservoir @ EL (+) 32.000 M near Head (P) Regulator and dropping into Right Side Connectivities of Polavaram Irrigation Project with components such as construction of Pump House associated Civil, Hydro-Mechanical, Electro-Mechanical works, construction of Electrical Sub-Station including Installation, Erection of Transmission Lines, Laying of MS Pressure Mains, Construction of Delivery Cistern, Earth work Excavation for Approach Channel, Operation and Maintenance of Lift system for 15 years complete, for providing Drinking water supply to the villages in up-land and drought prone areas of West Godavari, Krishna districts enroute of PIP Right Main Canal during months from January to April by pumping from the dead storage above EL (+)32.000 M of Polavaram Irrigation Project– under EPC Turnkey System |
Water Resourse |
Canals and Dams |
Above 100 CR |
07-Jul-2021 |
Click Here
|
63 |
Investigation, Soil exploration, Preparation of Designs, Drawings & Detailed Estimates including necessary clearances for Construction of 3 Regulators across Upputeru river under Kolleru Salinity Mitigation Project” i.e. i) Construction of Regulator Cum Bridge Cum Lock on Upputeru Straight Cut at KM 1.400 in Padatadika(v) of Kruthivennu(M) limits limits ii) Construction of Regulator Cum Bridge Cum Lock on Upputeru River at KM 57.950(M36/0) in Mollaparru (v) of Mogalthuru (M) in W.G.Dist., and iii) Construction of Regulator across Upputeru River at Km 10.560 near Dumpagadapa (V) of Akividu (M) in W.G. Dist. including supply and fabrication of Electro-Mechanical works, transmission lines for power supply, Protection works & Strengthening of Bunds for Upputeru river and straight cut, dredging of Upputeru river and straight cut under EPC System |
Water Resource |
Irrigation |
Above 100 Crores |
7-Jun-2022 |
Click Here
|
64 |
Lining of the Existing SRBC/GNSS canal up to berm level to draw 30000 Cusecs in between Gorakallu Reservoir to Owk Reservoir including Owk Tunnel III |
Water resourses |
Canals and Dams |
Above 100 CR |
26-Aug-2020 |
Click Here
|
65 |
Manufacture, Supply and Delivery of Tractors as per specifications including transportation to site, testing, commissioning, Registration with Life Tax , Insurance charges etc. complete inclusive of all taxes (excluding GST) to various Villages above 2000 population through DPOs at District Level” under LS Contract system are the following with Justification for the works and other factual background in nutshell |
Swachha Andhra Corporation |
Public Markets |
Above 100 Crores |
22-Mar-2022 |
Click Here
|
66 |
Manufacture, Supply and Delivery to the DPOs at District level of 10 L HDPE Bins including testing, transportation to designated places in the 13 districts of the State of Andhra Pradesh inclusive of all taxes (excluding GST) |
Swachha Andhra Corporation |
Public Markets |
Above 100 Crores |
25-Mar-2022 |
Click Here
|
67 |
Permanent restoration of Annamayya Project near Badanagadda (V), Rajampet Mandal of Annamayya District. |
Water Resources |
Irrigation |
787.77 Cr |
22-Dec-2022 |
Click Here
|
68 |
PIPHW- Main Dam Package – Additional works- Investigation, Survey, Preparation of Designs & Drawings etc., (1) Construction of RCC Diaphragm wall end cutoff for Spill Channel (2) Vibro stone columns and deep soil mixing in Gap-II (3) Construction of ECRF Dam Gap-I including Diaphragm wall cut off Vibro stone columns and deep soil mixing, Concrete Dam Gap-III and (4) Slope protection works on both sides of Spillway and Spill Channel etc., of Polavaram Irrigation Project and O&M for 5 years including defect liability period of 2 years – L.S. Contract System |
Water Resourse |
Canals and Dams |
Above 100 CR |
09-Apr-2021 |
Click Here
|
69 |
Planning, Engineering, Financing, Construction, Development, Operation And Maintenance Of Brahmadiha Coal Mine, State Of Jharkhand, India |
Andhra Pradesh Mineral Development Corporation Limited |
Public Markets |
Above 100 CR |
08-Apr-2021 |
Click Here
|
70 |
Processing of Beach Sand Minerals in Srikakulam District, Andhra Pradesh |
Andhra Pradesh Mineral Development Corporation Limited |
Public Markets |
Above 100 CR |
10-Nov-2021 |
Click Here
|
71 |
Procurement of 5 lakh Nos. of Tablet PCs for the School Education Department, GoAP |
APTS |
Education |
750 Cr |
17-Aug-2022 |
Click Here
|
72 |
PROCUREMENT TENDER NOTIFICATION FOR THE SUPPLY OF PEANUT-JAGGERY CHIKKI TO SCHOOL CHILDREN – UNDER “JAGANANNA GORUMUDDA (MID DAY MEAL SCHEME)” FOR THE YEAR 2020-21 |
APEWIDC |
Education Institutions |
Above 100 CR |
29-Apr-2020 |
Click Here
|
73 |
Procurement through e-tender from eligible bidders for supply at 700 destination points approximately, of 03 (Three) pairs of Uniform Cloth per student out of the students studying class I to X in Government / M.P.P/ Municipal / Residential Schools / Ashram Schools / Aided Schools / Model Schools / KGBVS of education and welfare departments in the state of Andhra Pradesh during the academic year 2020-2021, as covered by the technical sanction, as part of the Jagananna Vidya Kanuka scheme to supply uniforms to the students as part of development of requisite infrastructure to the students and in the Government Schools (Educational Institutions) under Mana Badi – Naadu Needu Programme introduced by the Government of AP (Department of School Education) |
APEWIDC |
Education Institutions |
Above 100 CR |
19-Mar-2020 |
Click Here
|
74 |
PROVIDING DRINKING WATER SUPPLY PROJECT IN THE WESTERN PART OF CHITTOOR DISTRICT” IN ANDHRA PRADESH |
RWS&S |
Water Supply |
2370 CR |
18-Jul-2022 |
Click Here
|
75 |
Providing Drinking Water Supply Scheme to Uddanam Area of Srikakulam District of Andhra Pradesh |
Water resourses |
Water Supply |
Above 100 CR |
04-May-2020 |
Click Here
|
76 |
Providing Fabrication for 432 Base Vehicles (FORCE Traveler Delivery Van, 3700mm WB, BSVI, Diesel Engine-Four Cylinders 2596CC-Since finalized & purchase order issued on dt.30-08-2022) and Medical Equipment to provide Health care Services (104) across Andhra Pradesh |
Health |
APMSIDC |
107 Cr |
01-Sep-2022 |
Click Here
|
77 |
Providing Storm Water Drainage Network, Improvement of Outfalls & Construction of Sewage Treatment Plant (STP) in Proddatur Municipality. |
PH&MD |
Water Management |
Above 100 Crores |
05-Jul-2022 |
Click Here
|
78 |
Public Health Circle, Ananthapuramu – Proddatur Municipality – Remodeling of existing water supply distribution pipeline and construction of ELSRs (4 Nos) with full SCADA including restoration of roads in Proddatur Municipality. |
PH&MD |
Water Management |
Above 100 Crores |
05-Jul-2022 |
Click Here
|
79 |
Rayalaseema Lift Scheme to draw and utilize 3 TMC per day from Sangameshwaram to SRMC @ Km. 4.00 from Pothireddypadu Head Regulator, Kurnool District, Andhra Pradesh |
Water Resourse |
Canals and Dams |
Above 100 CR |
25-Jul-2020 |
Click Here
|
80 |
RELATING TO CONSTRUCTION OF DEVELOPMENTAL WORKS (RESIDENTIAL BLOCK-No-I, RESIDENTIAL BLOCK No-II, SUITE BLOCK, KALYANAMANDAPAM & IMPROVEMENTS TO OLD KPS (KARNATAKA PRAVASI SOUDA) BLOCK) BY KARNATAKA STATE CHARITIES AT TIRUMALA |
TTD |
Public Buildings |
Above 100 Crores |
30-Mar-2021 |
Click Here
|
81 |
Repairs and Restoration of Damaged Portions of Somasila Dam at Somasila (V) of Ananthasagaram (M), SPSR Nellore district |
Water Resourses |
Canals and Dams |
Above 100 CR |
28-Dec-2021 |
Click Here
|
82 |
Request for Proposal to Implement Pan City ICT Solutions and setup of City Operations Center (COC) under the implementation of Smart City Mission in Tirupati. |
Municipal Administration & Urban Development |
Development |
Above 100 Crores |
09-Sep-2021 |
Click Here
|
83 |
Selection of Agency to establish and to operate “Emergency Response Center” (ERC) in the state of Andhra Pradesh |
APMSIDC |
Medical |
Above 100 Crores |
18-Nov-2019 |
Click Here
|
84 |
Selection of contractor for collection of seigniorage fee and consideration amount for Six Packages for 13-Districts in Andhra Pradesh |
Mines & Geology |
Public Markets |
Above 100 Crores |
29-Oct-2021 |
Click Here
|
85 |
Selection of Contractor for Excavation and Removal of Overburden and Barytes (Rom) Ore at Mangampet Barytes Project, Mangampeta (V), Obulavaripalli (M), Kadapa District, AP., through ETender Cum E-Auction |
APMDCL |
Public Markets |
Above 100 CR |
03-May-2021 |
Click Here
|
86 |
Selection of Fleet-provider/Operator for Procurement, Operation & Maintenance Of 350 9M/12M Fully Built AC Electric Buses With Demand Incentive Under Phase-II of FAME India Scheme On Gross Cost Contract Basis (GCC) Through e-Tendering |
APSRTC |
Road Transport |
Above 100 CR |
03-Jun-2021 |
Click Here
|
87 |
Selection of Service Provider for providing “Emergency Response Services” (108) across the state of Andhra Pradesh |
APMSIDC |
Medical |
Above 100 Crores |
18-Nov-2019 |
Click Here
|
88 |
Selection of Service Provider for providing “Mobile Medical Unit (MMU) Services” (104) across the state of Andhra Pradesh |
APMSIDC |
Medical |
Above 100 Crores |
18-Nov-2019 |
Click Here
|
89 |
Selection of Service Provider for Providing MMU Services (104 services) across Andhra Pradesh |
APMSIDC |
Health |
182 Cr Approx |
10-Jan-2023 |
Click Here
Click Here
Click Here
|
90 |
Special Instructions in respect of Joladarasi reservoir on Kundu River findings given on 17.06.2020 pointed out by the self same Chief Engineer as TIA concerned, as findings already given, for any variation it is either to issue tender notice separately as it is or left open to apply by addressing a request letter as to what specific findings are in variation, with out financial loss to Government to consider after uploading and inviting within seven working days public objections if any to it and consider in tune to the above for all covered in same area and in same alignment to Kundu River |
Water resourse |
Canals and Dams |
Above 100 CR |
17-Jun-2020 |
Click Here/3d-flip-book]
|
91 |
Strengthening / Upgradation of AHs (Area Hospitals) and CHCs (Community Health Centre’s in 13 Districts under 3 regional packages (Under NABARD XXIV, XXV AND NAVARATNAULU Schemes) in Andhra Pradesh |
APMSIDC |
Health |
Above 100 CR |
24-Jul-2020 |
Click Here
|
92 |
Strengthening of existing Government Medical Colleges and attached Institutions in the State under Nadu-Nedu Programme under packages |
APMSIDC |
Health |
Above 100 CR |
30-Jun-2021 |
Click Here
|
93 |
Strengthening of existing Medical Colleges & attached Institutions and Establishment of New Government Medical Colleges in the State of Andhra Pradesh under Nadu-Nedu Programme under packages |
APMSIDC |
Health |
Above 100 Crores |
27-Apr-2021 |
Click Here
|
94 |
SUPPLY & INSTALLATION OF SUBMERSIBLE PUMP SETS WITH ACCESSORIES SUITABLE FOR AGRICULTURAL BOREWELLS |
Panchayat raj and rural development |
Water Supply |
Above 100 CR |
19-Nov-2020 |
Click Here
|
95 |
SUPPLY AND INSTALLATION OF MICRO IRRIGATION SYSTEMS, 2021-22 |
Andhra Pradesh Micro Irrigation Project (APMIP) |
water Supply |
Above 100 CR |
11-Aug-2021 |
Click Here
|
96 |
Supply of 432 Base Vehicles for use as Mobile Medical Units for providing Healthcare Services (104) across Andhra Pradesh |
APMSIDC |
Medical |
Above 100 Crores |
01-Jun-2022 |
Click Here
|
97 |
Supply of 5,62,218 No’s of AMD Athlon 3000 / Intel Pentium Silver Series based Laptop Computers to the eligible and willing beneficiaries in place of financial assistance to the students under Jagananna Ammavodi, Jagananna Vasathi Deevena Schemes |
APEWIDC |
Educational Institutions |
Above 100 Crores |
04-Apr-2022 |
Click Here
|
98 |
Supply of 90,926 No’s of Intel Core i3 AMD Ryzen 3 – 3250 based Laptop Computers to the eligible and willing beneficiaries in place of financial assistance to the students under Jagananna Vasathi Deevena Scheme |
APEWIDC |
Educational Institutions |
Above 100 Crores |
04-Apr-2022 |
Click Here
|
99 |
Supply of Fully Equipped Mobile Medical Units for providing Healthcare Services (104) across Andhra Pradesh. |
APMSIDC |
Health |
Above 100 Crores |
27-Dec-2021 |
Click Here
|
100 |
The Procurement Of 9260 Mobile Dispensing Units From Manufacturers cum Suppliers, For The Purpose Of Door Delivery Programme Under Public Distribution System Through Government E-Market Place Gem Online Portal Of Government Of India |
Andhra Pradesh State Civil Supply's Corporation Limited |
Public Markets |
Above 100 CR |
25-Sep-2020 |
Click Here
|
101 |
Upgradation of Gandikota-CBR Lifts and Gandikota to Paidipalem Lifts”, B) “Development of Micro Irrigation under PBC, CBR Right Canal and GKLI Systems” C) “Investigation, Design and Construction of Lift Irrigation Scheme to Lift 8.00 TMC of water from Kundu River and delivering to SR-1 of TGP including construction of weir on Kundu River near Jonnavaram village in Duvvur Mandal of YSR District |
APEWIDC |
Canals and Dams |
Above 100 CR |
10-Dec-2020 |
Click Here
|
102 |
Water Resources Department – HNSS Project Phase II – “Line estimate including S&L Operations for the proposed By-Pass canal from Km 41.000 to Km 125.000 of Madakasira Branch Canal to feed tanks in Madakasira constituency in Anantapuramu District (now Satyasai District) and maintenance for a period of 15 years. |
Water Resources |
Irrigation |
214.85 Cr |
31-Oct-2022 |
Click Here
|
103 |
Widening and Strengthening (including maintenance) of the State Highways, and Major district Roads in Andhra Pradesh in 12 districts (other than Srikakulam out of the thirteen districts of Andhra Pradesh) |
R&B |
Roads |
Above 100 CR |
10-Jun-2020 |
Click Here
|
104 |
Widening of balance work of HNSS Main Canal including lining and extension of structures etc complete to carry a discharge of 6300 Cusecs from KM 88.000 to KM 216.300 and construction of additional pumping stations for HNSS Scheme from PS6 to PS8 three No’s adjacent to existing pumping stations including excavation of forebay supply and erection of pumps and motors substation etc to pump a discharge of 2450 Cusecs in Kurnool and Ananthapuramu Districts and Maintenance up to 15 years. |
Water Resourses |
Canals and Dams |
Above 100 CR |
18-Oct-2021 |
Click Here
|
105 |
Widening of balance work of HNSS Main Canal including lining and extension of structures etc., complete to carry a discharge of 6300 Cusecs from KM–4.806 to KM 88.000 and construction of additional pumping stations for HNSS Scheme from PS1 to PS5 five No’s adjacent to existing pumping stations including excavation of fore-bay supply and erection of pumps and motors substation etc to pump a discharge of 2450 Cusecs in Kurnool District and Maintenance up to 15 years. |
Water Resourse |
Canals and Dams |
Above 100 CR |
18-Oct-2021 |
Click Here
|
106 |
Yeleru and Tandava canals Link Project |
Water Resourses |
Canals and Dams |
Above 100 CR |
19-Jul-2021 |
Click Here
|