Canals, Dams

S.no Name Of The Project Project Cost Date Of Upload In The Website Findings & Recommendations
1 “Improvements and providing lining to GNSS Main Canal from Km.0.000 to Km.32.640/34.092 in YSR District” under LS Contract System. Above 100 Crores 11-Oct-2021 Click Here
2 “Improvements and providing lining to GNSS Main Canal from Km.32.640/34.092 to Km.56.00 in YSR District” under LS Contract System. Above 100 Crores 11-Oct-2021 Click Here
3 (1) Upgradation of Canal System from Pothireddypadu Head Regulator and BCR Complex from foreshore of Srisailam Reservoir & (2) Improvements to the existing SRBC/GNSS Canal up to Berm level from Banakacherla Complex to Gorakallu Balancing Reservoir from KM 0/0 to KM 56.775.. Above 100 CR 25-Jul-2020 Click Here
4 COMMON FINDINGS & RECOMMENDATIONS OF THE JUDGE, JUDICIAL PREVIEW, A.P. Dt.04-02-2021-ON THE REQUEST FOR PROPOSAL (RFP) KEPT FOR PUBLIC VIEW TO SUBMIT ANY QUERIES, AS A PART OF THE JUDICIAL PREVIEW PROCESS BEFORE ITS FINALIZATION TO ISSUE TENDER NOTICES FROM THE TENDER DOCUMENTS INVITING ELIGIBLE BIDDERS TO SUBMIT BID ONLINE THROUGH THE GoAP’s ONLINE PROCUREMENT PORTAL (https://tender.apeprocurement.gov.in) BY THE REVERSE AUCTION PROCESS IN COMPLIANCE WITH THE E-PROCURMENT NOTICES INVITING TENDER CUM E-AUCTION (REVESE TENDERING), Viz, Above 100 CR 04-Feb-2021 Click Here
5 Construction of a new Reservoir across Kundu River to a capacity of 0.80 TMC near Joladarasi (V) of Koilkuntla (M) of Kurnool (Dt) Above 100 CR 17-Jun-2020 Click Here
6 Construction of Lift Irrigation Schemes and Supply Channels to feed MI Tanks in Lakkireddypally and Ramapuram Mandals in Y.S.R.Kadapa District from GNSS Canal to HNSS Canal through Kaletivagu Reservoir” under LS Contract System. Above 100 Crores 24-Feb-2022 Click Here
7 De-siltation of Silt from the Foreshore of Sir Arthur Cotton Barrage from K.M.3.000 to K.M.12.150 in Godavari river towards Right Bank (AGRB) in West Godavari District. Above 100 Crores 12-Jan-2022 Click Here
8 De-silting of Silt from the Foreshore of Sir Arthur Cotton Barrage from K.M.3.000 to K.M.12.150 in Godavari river towards Left Bank (AGLB) in East Godavari District. Above 100 Crores 12-Jan-2022 Click Here
9 Formation of Balancing Reservoirs 3 No.s 1. Mudivedu Balancing Reservoir near Mudivedu(V) in Kurabalakota(M) 2.Nethiguntapalli Balancing Reservoir near Nethiguntapalle (V) in Punganur (M) and 3. Avulapalli Balancing Reservoir near Avulapalli (V) in Somala (M) of Chittoor Dist.a Above 100 CR 24-Feb-2021 Click Here
10 HNSS Project Phase-II – Investigation, design and Formation of Jilledubanda Reservoir, near Mudigubba, including construction of 2No’s off take sluices, surplus weir and off take-cum-Cross Regulator on HNSS Main Canal @Km 377.100 and Distributory system including construction of CM&CD works in Mudigubba, Bathalapalli, Tadimarri & Dharmavaram Mandals in Ananthapuramu District Above 100 Crores 13-Sep-2021 Click Here
11 In The Case Of Design, Engineering, Manufacturing, testing at manufacturer’s works before dispatch, Supply, transportation, storage at site, insurance, erection, testing and commissioning of 2 Nos.,115 MW capacity Vertical Francis Turbine generator units along with all associated auxiliary and ancillary equipment, 220KV switchyard & Power evacuation Structures including balance civil works of power house, Penstock, Butterfly valve, Spherical /Shutoff Rotary valves etc., at Lower Sileru Power House on EPC (TURN KEY) basis. Above 100 Crores 07-Jun-2021 Click Here
12 Investigation and Construction of Lift Schemes to Lift water from GNSS to HNSS under EPC Turnkey System Above 100 CR 07-Dec-2020 Click Here
13 Investigation, Design, Construction of Lift Scheme- for Lifting of water from Polavaram Reservoir @ EL (+) 32.000 M near Head (P) Regulator and dropping into Right Side Connectivities of Polavaram Irrigation Project with components such as construction of Pump House associated Civil, Hydro-Mechanical, Electro-Mechanical works, construction of Electrical Sub-Station including Installation, Erection of Transmission Lines, Laying of MS Pressure Mains, Construction of Delivery Cistern, Earth work Excavation for Approach Channel, Operation and Maintenance of Lift system for 15 years complete, for providing Drinking water supply to the villages in up-land and drought prone areas of West Godavari, Krishna districts enroute of PIP Right Main Canal during months from January to April by pumping from the dead storage above EL (+)32.000 M of Polavaram Irrigation Project– under EPC Turnkey System Above 100 CR 07-Jul-2021 Click Here
14 Investigation, Soil exploration, Preparation of Designs, Drawings & Detailed Estimates including necessary clearances for Construction of 3 Regulators across Upputeru river under Kolleru Salinity Mitigation Project” i.e. i) Construction of Regulator Cum Bridge Cum Lock on Upputeru Straight Cut at KM 1.400 in Padatadika(v) of Kruthivennu(M) limits limits ii) Construction of Regulator Cum Bridge Cum Lock on Upputeru River at KM 57.950(M36/0) in Mollaparru (v) of Mogalthuru (M) in W.G.Dist., and iii) Construction of Regulator across Upputeru River at Km 10.560 near Dumpagadapa (V) of Akividu (M) in W.G. Dist. including supply and fabrication of Electro-Mechanical works, transmission lines for power supply, Protection works & Strengthening of Bunds for Upputeru river and straight cut, dredging of Upputeru river and straight cut under EPC System Above 100 Crores 7-Jun-2022 Click Here
15 Lining of the Existing SRBC/GNSS canal up to berm level to draw 30000 Cusecs in between Gorakallu Reservoir to Owk Reservoir including Owk Tunnel III Above 100 CR 26-Aug-2020 Click Here
16 PIPHW- Main Dam Package – Additional works- Investigation, Survey, Preparation of Designs & Drawings etc., (1) Construction of RCC Diaphragm wall end cutoff for Spill Channel (2) Vibro stone columns and deep soil mixing in Gap-II (3) Construction of ECRF Dam Gap-I including Diaphragm wall cut off Vibro stone columns and deep soil mixing, Concrete Dam Gap-III and (4) Slope protection works on both sides of Spillway and Spill Channel etc., of Polavaram Irrigation Project and O&M for 5 years including defect liability period of 2 years – L.S. Contract System Above 100 CR 09-Apr-2021 Click Here
17 Rayalaseema Lift Scheme to draw and utilize 3 TMC per day from Sangameshwaram to SRMC @ Km. 4.00 from Pothireddypadu Head Regulator, Kurnool District, Andhra Pradesh Above 100 CR 25-Jul-2020 Click Here
18 Repairs and Restoration of Damaged Portions of Somasila Dam at Somasila (V) of Ananthasagaram (M), SPSR Nellore district Above 100 CR 28-Dec-2021 Click Here
19 Special Instructions in respect of Joladarasi reservoir on Kundu River findings given on 17.06.2020 pointed out by the self same Chief Engineer as TIA concerned, as findings already given, for any variation it is either to issue tender notice separately as it is or left open to apply by addressing a request letter as to what specific findings are in variation, with out financial loss to Government to consider after uploading and inviting within seven working days public objections if any to it and consider in tune to the above for all covered in same area and in same alignment to Kundu River Above 100 CR 17-Jun-2020

Click Here/3d-flip-book]

20 Upgradation of Gandikota-CBR Lifts and Gandikota to Paidipalem Lifts”, B) “Development of Micro Irrigation under PBC, CBR Right Canal and GKLI Systems” C) “Investigation, Design and Construction of Lift Irrigation Scheme to Lift 8.00 TMC of water from Kundu River and delivering to SR-1 of TGP including construction of weir on Kundu River near Jonnavaram village in Duvvur Mandal of YSR District Above 100 CR 10-Dec-2020 Click Here
21 Widening of balance work of HNSS Main Canal including lining and extension of structures etc complete to carry a discharge of 6300 Cusecs from KM 88.000 to KM 216.300 and construction of additional pumping stations for HNSS Scheme from PS6 to PS8 three No’s adjacent to existing pumping stations including excavation of forebay supply and erection of pumps and motors substation etc to pump a discharge of 2450 Cusecs in Kurnool and Ananthapuramu Districts and Maintenance up to 15 years. Above 100 CR 18-Oct-2021 Click Here
22 Widening of balance work of HNSS Main Canal including lining and extension of structures etc., complete to carry a discharge of 6300 Cusecs from KM–4.806 to KM 88.000 and construction of additional pumping stations for HNSS Scheme from PS1 to PS5 five No’s adjacent to existing pumping stations including excavation of fore-bay supply and erection of pumps and motors substation etc to pump a discharge of 2450 Cusecs in Kurnool District and Maintenance up to 15 years. Above 100 CR 18-Oct-2021 Click Here
23 Yeleru and Tandava canals Link Project Above 100 CR 19-Jul-2021 Click Here